MAY 1991
50,000 SQUARE FEET
$9.1 MILLION
COMPLETED
The 3-D Animated Spiderman Ride at Universal Studios Orlando is a cutting-edge attraction that combines 3-D animation with advanced ride technology. This $9.1 million project showcases innovative design and construction methods in theme park attractions.
As the Construction Manager at Risk, our responsibilities included:
Adapting to changing production equipment space needs throughout the project.
Coordinating high-technology visual and sound effects systems with ride mechanics.
Ensuring synchronization of multiple projection and sound systems for a seamless experience.
Designing for intensive use with over 1 million cycles annually
Balancing the themed environment with operational requirements.
Timely installation of mechanical, electrical, and plumbing systems in a constantly evolving space.
Keeping diverse teams focused on the overall vision while addressing specific technical needs.