disney wide world of sports

COMPLETION DATE:

MARCH 1997

PROJECT SIZE:

220-acre sports complex with multiple venues

PROJECT COST:

$101 MILLION

PRESENT STATUS:

COMPLETED

Project Overview

The Disney’s Wide World of Sports Complex project involved the construction of a comprehensive 220-acre professional-grade sports facility designed to host amateur and professional sporting events of all levels. Completed in March 1997 at a cost of $101 million, this landmark construction management initiative created what would become one of the premier multi-sport complexes in the world. Serving as Associate Construction Manager, the project team coordinated the development of diverse athletic venues ranging from a major league baseball stadium to specialized facilities for tennis, track and field, softball, and basketball. The completed complex represented Disney’s strategic expansion into sports tourism and event hosting, combining world-class athletic facilities with Disney’s renowned operational excellence and guest experience. The project’s exceptional execution was recognized with the prestigious ABC Eagle Award for “Excellence in Construction.”

Project Scope

  • Construction of a major league baseball stadium (later named Champion Stadium)

  • Development of a comprehensive field house for indoor sports

  • Construction of a dedicated maintenance facility supporting complex operations

  • Creation of multiple baseball practice fields for team training

  • Development of regulation softball fields for tournament play

  • Construction of specialized little league fields for youth competitions

  • Implementation of a professional-grade running track and field facilities

  • Construction of a tennis stadium and pavilion for tournament events

  • Development of a softball tower providing administrative and viewing facilities

  • Construction of extensive parking facilities supporting venue operations

  • Implementation of site-wide infrastructure and utilities

  • Development of landscaping and pedestrian circulation systems

  • Integration with Disney’s broader Orlando resort infrastructure

Key Features

  • Professional Baseball Stadium: Major league-caliber facility designed for spring training and professional competition

  • Multi-Purpose Field House: Versatile indoor facility supporting basketball, volleyball, and other court sports

  • Tournament-Quality Sports Fields: Professional-grade playing surfaces for various field sports

  • Specialized Tennis Complex: Stadium court and pavilion designed for competitive tennis events

  • Track and Field Facility: Competition-grade running track with supporting field event areas

  • Youth Sports Venues: Dedicated facilities scaled for youth and amateur competition

  • Comprehensive Support Infrastructure: Maintenance facilities ensuring consistent venue quality

  • Integrated Design Aesthetic: Cohesive architectural approach reflecting Disney’s commitment to immersive environments

  • Spectator Accommodations: Thoughtfully designed viewing areas across multiple venues

  • Operational Efficiency: Purpose-built facilities supporting efficient event management and transitions

  • Award-Winning Construction: Execution quality recognized with the ABC Eagle Award for “Excellence in Construction”

Construction Approach

  1. Associate Construction Management Role: Collaborative oversight in partnership with Disney’s construction leadership

  2. Multi-Venue Coordination: Synchronized development of diverse sports facilities within a unified complex

  3. Disney Quality Standards: Implementation of Disney’s exacting requirements for guest experience and operational functionality

  4. Phased Facility Delivery: Strategic scheduling allowing partial complex operation during overall construction

  5. Professional Sports Compliance: Adherence to specific dimensional and quality requirements of various sports governing bodies

  6. Integration with Resort Operations: Careful coordination with Disney’s broader Orlando resort infrastructure and systems

Project Challenges

Diverse Venue Requirements:

 Managing the distinct technical specifications required for different professional sports facilities

Scale and Complexity:

Coordinating construction across a 220-acre site with multiple simultaneous venue developments

Professional Sports Standards:

 Meeting the exacting requirements of major league baseball and other sports governing bodies

Florida Environmental Considerations:

 Addressing stormwater management, soil conditions, and environmental regulations

Disney Brand Integration:

Ensuring facilities reflected Disney’s commitment to theming, quality, and guest experience

Operational Readiness:

Coordinating construction completion with Disney’s operational commissioning requirements