CTG successfully executed a comprehensive technology retrofit for Dr. Phillips High School and its 9th Grade Center in Orlando, Florida. This project showcases our expertise in implementing cutting-edge technological infrastructure in educational settings.
Installation of structural cabling systems
Cable wire testing and terminations
Equipment panel installation
Implementation of a complete operating system capable of fiber optic and Category 5 connectivity
Project Initiation and Assessment
• Conduct comprehensive site survey of existing infrastructure
• Develop detailed project scope and requirements
• Create project timeline and budget allocation
Design and Planning
• Engineer structural cabling system layout
• Plan equipment panel locations and specifications
• Design fiber optic and Category 5 network architecture
Procurement and Logistics
• Source high-quality materials and equipment
• Coordinate delivery schedules to align with installation phases
• Ensure compliance with educational institution procurement standards
Installation and Integration
• Implement structural cabling systems
• Install and configure equipment panels
• Deploy fiber optic and Category 5 cabling infrastructure
Testing and Quality Assurance
• Conduct comprehensive cable wire tests
• Perform terminations and connections
• Verify system integrity and performance metrics
System Activation and Optimization
• Initialize the complete operating system
• Fine-tune network settings for optimal performance
• Conduct thorough system checks and troubleshooting
Project Closeout and Handover
• Provide detailed documentation and as-built drawings
• Conduct staff training on new technology systems
• Perform final walk-through and obtain client sign-off
This implementation process ensures a systematic approach to the technology retrofit, guaranteeing a robust and future-ready infrastructure for Dr. Phillips High School and its 9th Grade Center.
Key Project Details:
Project Name: Dr. Phillips High School and 9th Grade Center Technology Retrofit
Location: Orlando, Florida
Client: Orange County Public Schools
Architect: N/A
Completion Date: July 1999
Project Size: Not specified in the given information
Project Cost: $843,000