Project details

Dr. Phillips High School and 9th Grade Center Technology Retrofit - OCPS

CTG successfully executed a comprehensive technology retrofit for Dr. Phillips High School and its 9th Grade Center in Orlando, Florida. This project showcases our expertise in implementing cutting-edge technological infrastructure in educational settings.
Key Project Details:
- Client: Orange County Public Schools
- Project Value: $843,000
- Service Provided: Construction Management
- Completion Date: July 1999
Project Scope:
The retrofit encompassed a wide range of technological upgrades, including:
Installation of structural cabling systems
Cable wire testing and terminations
Equipment panel installation
Implementation of a complete operating system capable of fiber optic and Category 5 connectivity
Implementation process
Project Initiation and Assessment
• Conduct comprehensive site survey of existing infrastructure
• Develop detailed project scope and requirements
• Create project timeline and budget allocationDesign and Planning
• Engineer structural cabling system layout
• Plan equipment panel locations and specifications
• Design fiber optic and Category 5 network architectureProcurement and Logistics
• Source high-quality materials and equipment
• Coordinate delivery schedules to align with installation phases
• Ensure compliance with educational institution procurement standardsInstallation and Integration
• Implement structural cabling systems
• Install and configure equipment panels
• Deploy fiber optic and Category 5 cabling infrastructureTesting and Quality Assurance
• Conduct comprehensive cable wire tests
• Perform terminations and connections
• Verify system integrity and performance metricsSystem Activation and Optimization
• Initialize the complete operating system
• Fine-tune network settings for optimal performance
• Conduct thorough system checks and troubleshootingProject Closeout and Handover
• Provide detailed documentation and as-built drawings
• Conduct staff training on new technology systems
• Perform final walk-through and obtain client sign-off
This implementation process ensures a systematic approach to the technology retrofit, guaranteeing a robust and future-ready infrastructure for Dr. Phillips High School and its 9th Grade Center.

Key Project Details:
Project Name: Dr. Phillips High School and 9th Grade Center Technology Retrofit
Location: Orlando, Florida
Client: Orange County Public Schools
Architect: N/A
Completion Date: July 1999
Project Size: Not specified in the given information
Project Cost: $843,000

Olympia High School – OCPS
Education, K-12,

Timbercreek High School
Education, K-12,

Jones High School Additions and Alterations Phase C
Education, K-12,

Jones High School Additions and Alterations Phase B
Education, K-12,

Jones High School Additions and Alterations Phase A
Education, K-12,
FEATURED
Other CTG Projects

Florida A&M – Student Housing
College and University, Development,

Greater Orlando Aviation Authority
Aviation, Government,
