Dr. Phillips High School and 9th Grade Center Technology Retrofit - OCPS

CTG successfully executed a comprehensive technology retrofit for Dr. Phillips High School and its 9th Grade Center in Orlando, Florida. This project showcases our expertise in implementing cutting-edge technological infrastructure in educational settings.

Key Project Details:
  • Client: Orange County Public Schools
  • Project Value: $843,000
  • Service Provided: Construction Management
  • Completion Date: July 1999
Project Scope:
The retrofit encompassed a wide range of technological upgrades, including:
  1. Installation of structural cabling systems

  2. Cable wire testing and terminations

  3. Equipment panel installation

  4. Implementation of a complete operating system capable of fiber optic and Category 5 connectivity

Implementation process

  1. Project Initiation and Assessment
    • Conduct comprehensive site survey of existing infrastructure
    • Develop detailed project scope and requirements
    • Create project timeline and budget allocation

  2. Design and Planning
    • Engineer structural cabling system layout
    • Plan equipment panel locations and specifications
    • Design fiber optic and Category 5 network architecture

  3. Procurement and Logistics
    • Source high-quality materials and equipment
    • Coordinate delivery schedules to align with installation phases
    • Ensure compliance with educational institution procurement standards

  4. Installation and Integration
    • Implement structural cabling systems
    • Install and configure equipment panels
    • Deploy fiber optic and Category 5 cabling infrastructure

  5. Testing and Quality Assurance
    • Conduct comprehensive cable wire tests
    • Perform terminations and connections
    • Verify system integrity and performance metrics

  6. System Activation and Optimization
    • Initialize the complete operating system
    • Fine-tune network settings for optimal performance
    • Conduct thorough system checks and troubleshooting

  7. Project Closeout and Handover
    • Provide detailed documentation and as-built drawings
    • Conduct staff training on new technology systems
    • Perform final walk-through and obtain client sign-off

This implementation process ensures a systematic approach to the technology retrofit, guaranteeing a robust and future-ready infrastructure for Dr. Phillips High School and its 9th Grade Center.

  • Key Project Details:

    • Project Name: Dr. Phillips High School and 9th Grade Center Technology Retrofit

    • Location: Orlando, Florida

    • Client: Orange County Public Schools

    • Architect: N/A

    • Completion Date: July 1999

    • Project Size: Not specified in the given information

    • Project Cost: $843,000

FEATURED

Other CTG Projects

Florida A&M – Student Housing

Florida A&M – Student Housing

College and University, Development,
Florida A&M University Development Research School

Florida A&M University Development Research School

College and University, Education,

Honors and Awards