Project details

Florida A&M University Continuing Services - Gaither Gymnasium


The Winter Haven Area Transit (W.H.A.T.) facility, completed in December 2007, stands as a testament to efficient design and community-focused infrastructure. This $3.2 million project encompasses a 5,979 sq. ft. Mediterranean-style terminal featuring twelve bus bays, serving as a crucial transportation hub for the Winter Haven area. The facility boasts concrete foundations, a tiled roof with wood trusses, stucco exterior, and comprehensive HVAC, plumbing, and fire protection systems.
Its design elements include Mediterranean-style pavilions, a ticket counter, and covered walkways, while a local artist’s mosaic work in the porcelain flooring adds a unique cultural touch. The project, a collaboration between the Winter Haven Board of Commissioners, Pickett-Hunter Associates, and key personnel Alfred Simmons, John Cleveland, and Jeffery Spencer, exemplifies the successful fusion of modern transit needs with aesthetic appeal and local influences.
Implementation process
- Planning: Assess existing systems and design upgrades
- HVAC Installation: Install new air handling units and components
- Energy Management: Upgrade Honeywell system
- Electrical and Communication: Implement new infrastructure
- Control System: Install digital controls and surge protection
- Testing: Conduct thorough system tests and calibrations
- Handover: Train staff and complete final inspections
This streamlined process highlights Construct Two Group’s efficient approach to modernizing building infrastructure while minimizing disruptions.

Key Project Details:
- Completion Date: December 2006
- Project Size: 20,000 sq ft
- Project Cost: $839,366.00
- Client: Florida A&M University Mr. Joseph Bakker
2400 Wahnish Way Tallahassee, FL 32307 Phone: 850- 599-3197
- Architect:
Pinnacle Engineering Group 3303 Thomasville Road, Suite 102. Tallahassee, FL 32308 Phone: 850- 422-1763

Olympia High School – OCPS
Education, K-12,

Timbercreek High School
Education, K-12,

Jones High School Additions and Alterations Phase C
Education, K-12,

Jones High School Additions and Alterations Phase B
Education, K-12,

Jones High School Additions and Alterations Phase A
Education, K-12,
FEATURED
Other CTG Projects

Florida A&M – Student Housing
College and University, Development,

Greater Orlando Aviation Authority
Aviation, Government,
