Timber Creek High School - OCPS

Timbercreek High School, located in Orlando, FL, is a state-of-the-art educational complex completed in June 2001. This expansive project, managed under the Construction Management approach, resulted in a modern, technologically advanced campus designed to meet the evolving needs of students and educators.
Project Specifications:
Project Size: 384,525 square feet
Campus Layout: Eight-building complex
Project Cost: $43.5 million
Completion Date: June 2001
Facility Features
The Timbercreek High School campus encompasses a diverse range of facilities, including:
- Administrative offices
- Music rooms
- Cafeteria
- Classrooms and laboratory spaces
- Football stadium
- Gymnasium
- Library
- Auditorium
Technological Integration
A standout feature of this educational complex is its advanced technological infrastructure. The entire campus is equipped with:
Category 5 voice/data systems
Fiber optic technology
These cutting-edge installations ensure that Timbercreek High School is well-prepared to meet the digital demands of modern education.
Construction Methodology
The project utilized tilt-up construction techniques, a method known for its efficiency and durability. This approach was applied to the Schenkel Schultz Prototype high school campus design, showcasing innovative construction practices in educational infrastructure.
Project Management Scope
The construction management team’s responsibilities encompassed several crucial areas:
Estimating
Value engineering
Procurement and management of long lead items
Construction contracting
This comprehensive approach ensured efficient project execution and optimal resource utilization.
Key Personnel
Program Manager: Mr. Glen White
Organization: URS/Orange County Public Schools
Contact:
Address: 6501 Magic Way, Building 200, Orlando, FL 32801
Phone: (407) 317-3700, Ext. 5494
Fax: (407) 317-3768
Project Executive: Derrick Wallace
Implementation process
- Project Initiation: Finalize requirements, establish goals, and conduct site analysis.Design Development: Refine prototype design, integrate specific requirements, and perform value engineering.
- Planning and Budgeting: Develop master schedule, finalize budget, and create procurement strategy.
- Site Preparation: Clear and grade site, implement erosion control, and construct foundations.
- Building Construction: Utilize tilt-up construction methods for efficient erection of all eight buildings.
- Systems Integration: Install advanced technology systems, including Category 5 voice/data and fiber optics.
- Specialized Facilities: Construct and equip stadium, gymnasium, auditorium, and other specialized areas.
- Quality Assurance: Conduct regular inspections, perform system testing, and ensure code compliance.
- Project Closeout: Obtain final approvals, address punch list items, and prepare documentation for handover.
- Post-Construction Support: Manage warranty period, develop long-term maintenance plan, and provide ongoing guidance.

Key Project Details:
- Project Name: Timbercreek High School
- Location: Orlando, FL
- Client: Orange County Public Schools
- Architect: Schenkel Schultz (Prototype high school design)
- Completion Date: June 2001
- Project Size: 384,525 s.f., eight-building campus
- Project Cost: $43.5 million

Olympia High School – OCPS
Education, K-12,

Timbercreek High School
Education, K-12,

Jones High School Additions and Alterations Phase C
Education, K-12,

Jones High School Additions and Alterations Phase B
Education, K-12,

Jones High School Additions and Alterations Phase A
Education, K-12,
FEATURED
Other CTG Projects

Florida A&M – Student Housing
College and University, Development,

Greater Orlando Aviation Authority
Aviation, Government,